Location | Description | File |
Level 1 | LP4 Distribution Board | 4th-Distribution-Board-LP4.pdf |
Level 4 | Restack Works | 4th-Floor-Restack-Phase-2-Works.pdf |
N/A | Electric Cables Conformity | Certificate-of-Conformity-Electric-Cables.pdf |
N/A | Generators Conformity | CUMMINSPOWER-Generators-DeclarationofConformity.pdf |
N/A | Fire Inspections | Direction-Fire-Inspection-Report-4139_221.pdf |
N/A | Disabled Lift Confirmity | Disabled-Lift-Conformity.pdf |
N/A | Commissioning Boards | General-Commissioning-Dist-Boards.pdf |
N/A | Generator 2 Tests (factory) | Generator-No-2-Factory-Tests.pdf |
N/A | Generator 2 Tests (site) | Generator-No-2-Site-Tests.pdf |
Level 7 | Tolent Certification | Tolent-Handover-Cert-4139_221.pdf |